Positioned within the Chilean Atacama desert, the Oasis de Atacama challenge, which has the largest capability of any storage challenge on this planet, shall be in-built 5 phases and is predicted to be totally operational in 2026 with an put in photo voltaic capability of 1GW and 4.1GWh of storage capability.
Ingeteam has been operational in Chile for over ten years and has provided its expertise for 68 solar energy vegetation.
Final month, Grenergy signed an influence buy settlement (PPA) for the fourth section of the challenge, for which the event will see the corporate add 260MW of recent photo voltaic capability, alongside 1.1GWh of recent storage capability.
See the unique model of this text on PV Tech.