Drilling has began for a geothermal heating system on the website of aviation engine producer MTU Aero Engines in Munich, Germany.
Drilling has begun for a geothermal doublet on the most important plant of MTU Aero Engines AG, an engine producer situated within the north of Munich, Germany. Sooner or later, geothermal power as a warmth supply will largely exchange the plant’s present gas-powered warmth provide. A geothermal output of at the least 10 MW is predicted.
Boreholes will likely be drilled to a depth of round two kilometers, concentrating on the Malm formation. Each wells will likely be drilled from a cluster drilling website situated instantly east of MTU’s manufacturing amenities. The deliberate manufacturing properly is aimed in the direction of the south and the deliberate reinjection properly in the direction of the north. Because of the deviated path, the drilling distances are as much as 3,300 m per gap. If the whole lot goes in response to plan, the deep drilling work, together with short-term checks, will likely be accomplished by mid-2024.
MTU is a Munich-based plane engine producer specializing in each navy and civil plane purposes. We had beforehand reported on the plans of MTU to combine geothermal heating to their amenities and a previous utility for a geothermal exploration allow from the federal government of Higher Bavaria, in addition to the choice of German drilling firm Daldrup & Söhne AG as the overall contractor for the venture.
ERDWERK has been managing MTU’s geothermal power venture since 2020, beginning with the fundamental investigation, assist within the mining approval course of together with the appliance for the Karlsfeld-Ost allow subject, the feasibility examine, detailed planning and the tendering course of. Through the drilling and testing section, ERDWERK supplies steady geological and drilling assist and likewise acts because the shopper’s consultant on website.
Supply: Erdwerk