OEG Vitality Group’s Specialist Marine Consultants and Fern Communications have been contracted to ship a turnkey marine coordination answer to the Hai Lengthy Offshore Wind mission in Taiwan.
The 1,022 MW mission, positioned between 45 and 70 km from the coast and sitting in water depths between 35 and 55 m, is a joint mission being developed by Northland Energy, Yushan Vitality and Mitsui, offering sufficient power to energy a couple of million Taiwanese households, says OEG.
The contract shall be all through the set up and commissioning works and can embrace the availability of an skilled U.Ok. marine coordination group, in addition to growth of an area Taiwanese group to handle the mission marine coordination heart within the longer-term.
“We’re delighted to have been awarded the contract for the availability of those specialist providers, which additional underlines OEG Renewables place as a key participant offering essential providers to the offshore wind market in Taiwan and the broader APAC area,” says OEG’s Kevin Wu. “OEG Renewables is uniquely positioned to service international shoppers and tasks with its in depth working footprint in over 60 international locations and rising subsea and topside service choices.”
This shall be OEG Renewables’ twentieth mission in Taiwan.