![](https://www.thinkgeoenergy.com/wp-content/uploads/2018/12/LumutBalai_view_WIKA.png)
A groundbreaking ceremony has signaled the beginning of development for the Lumut Balai Unit 2 geothermal energy plant in South Sumatra, Indonesia.
PT Pertamina Geothermal Power (PGEO) has damaged floor on the development of the ability plant and Fluid Assortment and Reinjection System (FCRS) for the Lumut Balai Unit 2 mission in South Sumatra, Indonesia. The 55-MW enlargement of the present energy facility is about to function by the top of 2024.
“Development [of] Lumut Balai PLTP Unit 2 will improve the geothermal capability within the Lumut Balai Space, bringing the full geothermal power within the space to 110 MW, making it the third largest PLTP (pembangkit listrik tenaga panas bumi / geothermal energy plant) in Sumatra,” mentioned PGEO President Director Julfi Hadi through the groundbreaking ceremony.
Unit 1 of the Lumut Balai geothermal energy mission got here on-line in October 2019.
Julfi additional mentioned that the Lumut Balai Unit 2 mission has been the product of collaboration between three corporations from Japan, China, and Indonesia. In late 2022, PGEO awarded the EPCC contract for the mission to Mitsubishi Company Consortium, PT Wijaya Karya (Persero) Tbk, and SEPCO III Electrical Energy Development Co. Ltd.
The mission has additionally obtained USD 155 million in funding from the Japan Worldwide Cooperation Company (JICA).
“That is the Firm’s step in supporting the federal government to attain the nationwide power combine goal of 23 p.c by 2025 and web zero emissions [by] 2060,” added Julfi.
PGEO has ongoing exploration efforts for different geothermal websites in Indonesia together with the Manner Ratai mission with Chevron and the Kotamobagu mission with Chevron and Mubadala Power. On the worldwide entrance, PGEO with Masdar Power is backing the event of the Suswa geothermal website in Kenya.
Supply: Bisnis.com